New apartments in Meridian, Idaho.
Arête Residences is a new apartment complex under construction off Ten Mile Road. Phase 1 is 152 apartments and townhomes, opening building by building from April 1 to September 8, 2027. Rent starts at $1,900 a month.
Six buildings, one at a time.
Arête Residences sits on 25 acres at 233 S Tallac Lane, inside Discovery Meridian in Southwest Meridian. Phase 1 has three townhome buildings and three apartment buildings with elevators. Each building has its own target date.
| Building | Homes | Target date |
|---|---|---|
| Building A | 10 three-bedroom townhomes | April 1, 2027 |
| Building B | 8 three-bedroom townhomes | May 8, 2027 |
| Building C | 8 three-bedroom townhomes | June 8, 2027 |
| Building D | 42 one- and two-bedroom apartments | July 8, 2027 |
| Building E | 42 one- and two-bedroom apartments | August 8, 2027 |
| Building F | 42 one- and two-bedroom apartments | September 8, 2027 |
Dates are targets and may change. The pool and the amenity clubhouse open with Building D. Phase 2 adds 364 homes and a full indoor clubhouse with a fitness center; its schedule has not been set. The site plan shows where each building sits.
Three plans, all new.
67 one-bedroom apartments, 59 two-bedroom apartments and 26 three-bedroom townhomes. Every home is brand new, so yours would be the first set of keys.
One Bedroom
Buildings D, E and F. Target dates July 8 to September 8, 2027.
See the one-bedroom apartmentsTwo Bedroom
Buildings D, E and F. Target dates July 8 to September 8, 2027.
See the apartments for rentThree Bedroom
Buildings A, B and C, each with an attached garage. Target dates April 1 to June 8, 2027.
See the three-bedroom townhomesEvery layout, with live availability once homes are released, is on the floor plans page.
Drone photo, September 2026.Framed to three stories.
The townhome foundations and slabs went in during July 2026. The apartment building foundations followed in August. By September the townhomes were framed to their full three stories and the amenity clubhouse had broken ground.
We post drone footage and site photos each month in the Journal. The latest is the September 2026 construction update, and the construction gallery has the ground-level photos.
Rendering. Final finishes may vary.Off Ten Mile Road, Southwest Meridian.
Grocery Outlet, Starbucks and First Watch are on site at Discovery Meridian. The District at Ten Mile, with Target and Lifetime Fitness, is next door and opening in phases through 2027. The property has direct access to the Fivemile Creek Pathway.
Typical drives from 233 S Tallac Lane: St. Luke’s Meridian about 14 minutes, Boise Airport about 17, downtown Boise about 20 and Micron about 22. Times are Google Maps typical drives on a weekday at 10 AM, measured November 15, 2026. Rush hour takes longer. More on the neighborhood page.
What every new home includes.
The same finishes in every apartment and townhome, and the shared spaces that open with Phase 1.
Quartz and stainless
Quartz countertops, a kitchen island, wood-tone and white cabinetry, and a stainless refrigerator, range, microwave and dishwasher.
Washer and dryer
A full-size washer and dryer inside every home.
Air conditioning and a balcony
Air conditioning in every home, plus a private balcony or patio.
In the apartment buildings
Elevators, building-level controlled access, a package room and smart lockers.
Outside
Two pickleball courts, a pool with a raised spa, a splash pad, a dog park, a fire pit and grills.
Yoga and spin studios
A yoga studio and a spin studio in the amenity clubhouse, which opens with Building D.
The full list, with what arrives in Phase 2, is on the amenities page. Dogs and cats are welcome, up to two per home; limits and fees are in the pet policy.
New apartments in Meridian, answered.
When do the new apartments at Arête Residences open?
The first homes are the three-bedroom townhomes in Building A, with a target date of April 1, 2027. Buildings B and C follow on May 8 and June 8. The one- and two-bedroom apartments are in Buildings D, E and F, with target dates of July 8, August 8 and September 8, 2027. Dates are targets and may change.
Can I apply for a new apartment now?
Not yet. Applications are expected to open in January 2027 for the first townhomes, then about 90 days before each building opens. Until then you can join the pre-leasing list, and you get one email when your building opens for applications.
How much is rent at Arête Residences?
As of November 15, 2026, rent starts at $1,900 a month for a one-bedroom, $2,400 for a two-bedroom and $2,975 for a three-bedroom townhome. Every home has a required $125 monthly technology and internet package, which makes those $2,025, $2,525 and $3,100 a month before utilities. Rents can change until a lease is signed. Current rents and fees are on the floor plans page.
What do I pay before move-in?
An application fee of $45 for each adult applicant, a one-time $500 administrative fee that is non-refundable, a $50 media package activation fee, a refundable security deposit of $800 with standard approval, and the first month’s rent, prorated from your move-in day. The deposit can be higher if an application is approved with conditions; how deposits are set is in the screening criteria.
How many apartments will Arête Residences have?
Phase 1 is 152 homes: 67 one-bedroom apartments, 59 two-bedroom apartments and 26 three-bedroom townhomes. Phase 2 adds 364 homes, for 516 homes in all on the 25-acre site. The Phase 2 schedule has not been set.
Where is the new apartment complex?
At 233 S Tallac Lane, Meridian, ID 83642, inside Discovery Meridian off Ten Mile Road, next to the District at Ten Mile and near the Ten Mile interchange on I-84. The neighborhood page lists what is nearby and the drive times.
Who is building Arête Residences?
Arête Residences is built, owned and managed by Dolomiti Asset Group, the same local team behind The Enclave in Northeast Meridian. The buildings were designed by Borges Architecture | Interiors and are being built by Perryman Construction Management.
From today to your first set of keys.
Four steps. Pricing is out, and applications are next.
Today
Join the list
About a minute. You hear first when each building opens for applications.
Out now
Pricing released
Rents and fees for every plan are on the floor plans page.
Next · expected January 2027
Applications open
First for the townhomes, then about 90 days before each building opens.
Target · April 1, 2027
First homes open
Building A townhomes. Later buildings follow through September 2027.
Want a new home here?
The first townhomes are expected to open in April 2027 and the apartments from July 2027. Join the pre-leasing list and you hear first when each building opens for applications.
One email when your building opens for applications, and a monthly build update. Unsubscribe any time.