The community
Site plan.
The whole of Arête at Discovery Meridian — townhomes, flats, and the amenities between them. Pick a floor, then tap any home to see its type, size and when its building opens. A phased opening, beginning with the townhomes in April 2027.
Tap a home for details · pinch or scroll to zoom
Floor 1
Pick a home
Phased opening from April 2027
Rendering. Final finishes may vary.
All floor plans →Floor plan drawings for the flats are being finalized.
Request info on this homeSee every home on Floor 1 ↓Home types
1 Bed · 1 Bath
Flats · 655 sq ft
Flats · 655 sq ft
2 Bed · 2 Bath
Flats · 930 sq ft
Flats · 930 sq ft
3 Bed · 3 Bath Townhome
Three levels · 1,890 sq ft
Three levels · 1,890 sq ft
Accessible home
Dashed outline
Dashed outline
Future phase
Not yet available
Not yet available
Leased
Colored homes are open
Colored homes are open
Homes on Floor 1
Townhomes span all three levels, so they appear on every floor.
The opening, phase by phase
APR 2027
Townhomes — Building A
Building A, the southernmost townhome building, opens first (target April 1).
MAY – JUN 2027
Townhomes — Buildings B & C
Building B opens in May (target May 8), then Building C in June (target June 8).
JUL – SEP 2027
The Flats
Flats open in order D, E, F (targets July 8, August 8, September 8). The resort pool and amenity clubhouse open with Building D.
FUTURE
Next phase
Phase 2 adds 364 more homes, for 516 in all.