Rendering, the courtyard · final details may vary
Arête  /  Journal  /  From the Plans · Amenities
From the Plans · 4 min read

From the plans: the amenities of Phase 1.

Published November 17, 2026· The Arête Team· From the plans

Nine amenities are part of Phase 1 at Arête Residences, and you can already find most of them on the approved plans. This month we pulled the real sheets, the ones our crews build from, and put them next to our latest site photos. Here is where the resort pool, the clubhouse and the two lighted pickleball courts sit, what is built so far, and the dates to look forward to.

Start at the pool.

The plan puts the resort pool and its raised spa right beside the amenity clubhouse, with a cold plunge next to the spa, the splash pad at the top of the deck and shade structures around it. The pool and the clubhouse are planned to open with Building D, the first of the apartment buildings, with a target of July 2027.

Architect's site plan of the Arête pool deck, labelled Splash Pad, Pool Deck, Pool, Cold Plunge and Spa, with Pickleball Court 1 and Pickleball Court 2 beside it
From the approved plans, sheet G-004 · Borges Architectural Group · two labels simplified · final details may vary
9
Phase 1 amenities
2
Lighted pickleball courts
Jul 2027
Pool & clubhouse target
Apr 1
First townhomes target, 2027

Inside the clubhouse.

The clubhouse on the plan holds two dedicated rooms: a yoga studio and a spin studio. Work has started on the ground, too. The architect even drew the spin bikes. In September our crews were forming and pouring the building's footings; the photo below is how it looked from the drone that month.

Architect's floor plan of the Arête clubhouse showing the yoga studio, room 105, above the spin studio, room 104, with the spin bikes drawn in
From the approved plans, sheet A-111 · Borges Architectural Group · final details may vary
Drone photo from September 2026 of the Arête clubhouse site, with the footings being formed in the ground
Photo · clubhouse footings · September 2026

Two courts, lighted.

Next to the pool deck the plan shows the courts: two lighted pickleball courts, one of them striped to double as a basketball half-court. Each is drawn as a 44-by-20-foot court inside a 10-foot fence. Lights mean the courts keep going after sunset.

Rendering of two blue pickleball courts between the Arête apartment buildings at golden hour
Rendering · the pickleball courts · final details may vary
“Nine amenities in Phase 1. The pool and the clubhouse are planned to open with Building D in July 2027.”

The rest of the nine.

The pool and spa, the yoga studio, the spin studio, the pickleball courts and the basketball half-court are five of the nine. The other four:

  • A splash pad
  • An on-site, fenced dog park
  • A fire pit and BBQ grills under a pergola
  • A landscaped central courtyard with direct access to the Fivemile Creek Pathway
Rendering of the Arête courtyard at sunset: a pool with a raised spa, a fire pit under a pergola and two blue pickleball courts
Rendering · the courtyard · final details may vary

A full indoor clubhouse, with a fitness center, a lounge and coworking space, is planned for Phase 2.

Dates to look forward to.

  • January 2027: applications open for the first townhomes, then building by building, about 90 days before each building opens.
  • April 1, 2027: target opening for Building A, the first townhomes.
  • July 2027: target opening for Building D, the first apartments, along with the resort pool and the clubhouse.

These are target dates and they can change as the build moves. If a date moves, we will say so here.

Where the build stands.

These are from the site this month. The wood framing and sheathing are up, the window and door openings are cut in, and the roof framing is going on top.

Construction photo from November 2026: the front of an Arête building in wood framing and sheathing, four floors tall, with window openings and a stack of lumber on the dirt in front
Photo · framing at the site · November 2026
Construction photo from November 2026: an Arête building seen from the corner, framed and sheathed, with roof framing on top and a fenced work area below
Photo · framing at the site · November 2026

What’s next.

The Arête signs went up at the site this month, so the community now has a name on the ground as well as on the plan. For more photos from the site, see the November construction update.

Inside Arête

See the whole plan.

The interactive site plan shows every home in Phase 1, floor by floor, with the opening schedule for each building.

— The Arête Team · Southwest Meridian · November 2026

Get the next update in your inbox.

One short construction update a month, until we open. Same list that gets first look at floor plans and pricing updates.