Drone, site overview · July 10, 2026
Arête  /  Journal  /  Construction Update · July 2026
Construction Update · Vol. 2 · 5 min read

Construction update: July 2026.

Published July 21, 2026· The Arête Team· Vol. 2 of a monthly series

Volume two of our monthly construction series. On July 10 we put the drone up over the site again — and this month there is real, poured, rebar-and-concrete progress to show you. Foundations for the townhomes are going in, slabs are down across the parcel, and the neighborhood around us keeps rising.

The July 10 fly-through · Discovery Meridian & the Arête site

What changed this month.

Since the May update, the site has moved from earthwork into vertical foundations. The single biggest change: the townhome foundations are going in. In the fly-through above and the photo below, you can see the long rows of formed footings and rebar grids, with crews working down in the forms — the first hard outline of where the three-bedroom townhomes will stand. Elsewhere on the parcel, large slabs have been poured, clean rectangular pads laid out and ready for what comes next.

Aerial view of long rows of formed concrete footings and rebar grids for the Arête townhome foundations, with a construction crew working in the forms — July 10, 2026
Townhome foundations going in · July 10, 2026

The townhomes are taking shape.

Those footing rows are the foundations for The Townhomes — the limited collection of three-bedroom, three-bath homes at nearly 1,890 square feet, each with an attached garage. It’s the most distinctive home in the community, and it’s the first to break ground in a visible way. There’s a long road from a formed footing to a finished home, but this is the month it stopped being lines on a plan and started being concrete in the ground.

152
Phase 1 homes
~516
Total at full buildout
36
Acres (Discovery Meridian)
~11
Months to opening

The neighborhood is rising around us.

One of the reasons this location matters is everything going up next to it. Across the wider area, commercial buildings are being framed and topped out, and the retail that will sit within a short drive keeps taking shape. A Super Target is coming to the neighborhood nearby — to be clear, that’s a separate development on land that isn’t ours and isn’t part of Arête or Discovery Meridian, but it’s the kind of everyday convenience that will sit just up the road. Across the interchange, the District at Ten Mile continues its build-out. The point of the neighborhood story has always been that Arête isn’t going up alone — it’s arriving as the whole corner of Meridian arrives.

Wide aerial of the Arête site and the surrounding Southwest Meridian neighborhood, with graded pads, roadways, and the Boise foothills on the horizon — July 10, 2026
The wider site & neighborhood · July 10, 2026

What’s next.

The next thirty days are about continuing foundation and slab work and moving toward vertical framing on the first buildings. We’ll fly the site again in late August, from the same anchor angle, so the series keeps stacking into a clean time-lapse of the build. Watch the townhome foundations in next month’s shot — that’s where the change should be most visible.

“This is the month it stopped being lines on a plan and started being concrete in the ground.”

Why subscribe.

Each month, from the same angle, the site changes a little more — and the whole point of following along is watching it happen from the very start. It’s also the same interest list that gets first look at floor plans, pricing, the model unit, and founding-resident incentives when leasing opens ahead of our 2027 opening.

Inside Arête

Want a preview while you wait?

The marketing site is live — the apartments, the townhomes, the amenity package, and the neighborhood, all built around what we’re showing you here.

— The Arête Team · Southwest Meridian · July 21, 2026 · Next update: late August 2026

Get the next update in your inbox.

One short construction update a month, until we open. Same list that gets first look at floor plans and founding-resident pricing.